During August, construction works continued to progress at a good pace. In Portal 1, the structure is entering its final stage, with formwork currently underway. Portal 2 is reaching the level of its final residential floor, with the roof structure remaining as the next stage. Portal 3 has two levels remaining to complete its structure.
At the same time, masonry works continue to advance, with the perimeter walls of the apartments currently under construction. The project is therefore progressing both structurally and through the first stages of the building's enclosure works.
At the same time, masonry works continue to advance, with the perimeter walls of the apartments currently under construction. The project is therefore progressing both structurally and through the first stages of the building's enclosure works.